Rigging

  • AF Decom

    Service
    Decomissioning campaigns Ekofisk EPRD
    – RAT and riggers

    Installation(s)
    Ekofisk Q, W, FTP++
    Albuskjell, Cod, Tor, Booster H7

    Duration
    2009-2014

  • Archer

    Service
    Removal and installation of crown block

    Installation(s)
    Grane, Veslefrikk, Ula

    Duration
    May-July 2014

  • Archer

    Service
    Installation of drawwork winch

    Installation(s)
    Veslefrikk

    Duration
    July 2013

  • Fabricom

    Service
    Ekofisk FTP bypass and C-tour project
    – All RAT and rigging in the project
    – Installation planning
    – Heavy lift planning
    (>80.000hrs)

    Installation(s)
    Ekofisk J, M, FTP, B

    Duration
    2006-2008

  • Fabricom

    Service
    Statfjord fire water project
    – Installation planning of 36” titan pipe from seabed to topside inside colum
    – All Rat and rigging in the project

    Installation(s)
    Statfjord

    Duration
    2005-2006

  • Master Marine / OSM

    Service
    Structural repairs and installation of equipment in jack-up legs
    (>30.000 RAT hrs and rigging)

    Installation(s)
    L205 – Haven

    Duration
    Sept 2011 – Feb 2013

  • NAD

    Service
    Winterization of derrick (cladding)
    – Installation planning
    – Installation
    – Assembly control and MC
    – Rigging and mechanical
    – Structural reinforcements (welding)
    (>35.000hrs)

    Installation(s)
    West Hercules

    Duration
    Dec 2012 – Jun 2013

  • Navic

    Service
    Installation of Test Stand Handler
    – Rigging and installation of structural steel
    – Rigging and installation of test stand handler rig

    Installation(s)
    Bredford Dolphin

    Duration
    Jul 2014 –

  • NTE

    Service
    Replacement of windturbine blades
    – Planning
    – Subcontracting cranes
    – Rigging (heavy lift) of wind blades

    Installation(s)
    Hundhammarfjellet

    Duration
    2014

  • Reinertsen

    Service
    Installation of heavy lift structure
    – Installation planning of lift from crane
    – Rigging of heavy lift structure from crane to final position
    – Mechanical mouting

    Installation(s)
    Heimdal

    Duration
    May – Jun 2013

  • Statoil

    Service
    Removal and re-installation of heat 13 exchangers 1 – 6ton
    – Rigging planning
    – Prefab of temp steel
    – Rigging offshore/td>

    Installation(s)
    Heimdal

    Duration
    Apr – Jun 2014

  • Statoil

    Service
    Removal and re-installation of condensate pump (4 ton)
    – Rigging planning
    – Prefab of temp steel
    – Rigging offshore

    Installation(s)
    Heimdal

    Duration
    Feb – Jul 2014

  • Talisman

    Service
    Repair of roof plating
    – Rigging and access with use of Travo

    Installation(s)
    Gyda

    Duration
    2010

  • Talisman

    Service
    Repair of Seawate and Blackstart Caisson
    – Rigging of liners and equipment

    Installation(s)
    Gyda

    Duration
    2009-2011

  • Talisman

    Service
    Removal of sign
    – Rigging of plates

    Installation(s)
    Gyda

    Duration
    2011